Sale of barges

UR 108 (91 x 27 x 6 m), built in 1985, was recently sold to Canadian Buyers, to be used for the Hebron project. The formal takeover took place on 27 June 2014.

UR  1 (91 x 27 x 6 m), built in 1994, was sold to Italian Tug Owners, to be used for Mediterranean transport operations. The formal takeover of this barge took place on 2 July 2014.

Other news

30.05.2025 15:12
ANNUAL REPORT 2024
/ Read more
ANNUAL REPORT 2024
12.05.2025 16:18
M/V Lunita released from detention
/ Read more
M/V Lunita released from detention
29.04.2025 10:15
Crew arrested on board M/V Lunita
/ Read more
Crew arrested on board M/V Lunita
03.04.2025 16:30
Drug seizure on board M/V Lunita
/ Read more
Drug seizure on board M/V Lunita
27.05.2024 11:53
ANNUAL REPORT 2023
/ Read more
ANNUAL REPORT 2023

/ Archive
Archive